Teufelskuppe Delivers Compelling New Drill Results

RNS Number : 6352W
Kendrick Resources PLC
29 September 2026

Kendrick Resources Plc
(“Kendrick” or “the Company”)

Teufelskuppe Delivers Compelling New Drill Results

Excellent pXRF Results Achieved for Both the Diamond and Reverse Circulation Drilling Programmes

Kendrick Resources Plc is pleased to announce an update on the Teufelskuppe (“TK”) project.  A total of 90 drill holes have been completed to date, 38 diamond and 52 reverse circulation (“RC”) drill holes. Detailed logging and sampling are ongoing with sampled composites being submitted for independent certified laboratory analysis.

pXRF measurements and the confidence in the veracity of pXRF data based on its comparison with certified assays over the same core samples (announced on 2 September 2026) from the deposit, provides the opportunity for in-house derivation of both a geological model and the framework for a Mineral Resource Estimate which can be converted to a JORC (2012) Mineral Resource with the introduction of certified laboratory assays to replace pXRF estimates. The opportunity is being taken to define a geological model and generate an in-house volumetric estimate of mineralisation ahead of receipt of certified assays and the generation of a Mineral Resource.

Highlights

·    pXRF drill results for RC and diamond drill holes targeting TK1 to TK7 sills and dykes at Teufelskuppe

·    Impressive continuous LREO grade and combined mineralised width intercepts including 5.08% over 20m, 4.85% over 23m, 4.30% over 15m, 4.28% over 26m, 3.37% over 40m, 3.36% over 48m and 3.27% over 46m

·    Peak LREO grades including 6.98% over 6.0m, 5.90% over 7.0m, 5.84% over 8.0m, 5.42% over 4.5m, 5.38% over 7.0m, 4.987% over 7.0m, 4.82% over 7.0m and 4.80% over 11m

·    Peak LREO mineralised widths with continuous grades of more than 2.0% LREO offering potential future bulk high-grade tonnage including 2.81% over 78m, 2.2% over 48.75m, 2.55% over 43m, 2.25% over 41m, 2.85% over 33m, 2.84% over 32m and 2.87% over 28m

·    LREO grade continuity through mineralised intercepts from top to bottom contact remains a defining characteristic of the TK deposit providing potential for a substantial tonnage to be defined

·    A total of 90 drill holes completed with further infill diamond drilling underway.

Colin Bird, Chairman of Kendrick Resources, commented: “The consistency of grade combined with excellent continuity of mineralisation over substantial widths remain the defining features of the Teufelskuppe deposit. With two drill rigs operating we are expanding our coverage over the multiple sills and dykes that make up the Teufelskuppe carbonatite complex. The pXRF data provides a high degree of confidence in the quality, distribution and grade of mineralisation and the regular inflow of certified assay results is confirming the credence of the data which will enable the development of a Mineral Resource Estimate”. 

Table 1: pXRF Measurements for Teufelskuppe Diamond Drill Holes (TKDD019 to TKDD030) and RC Drill Holes (TKRC001 to TKRC20)

 

Borehole ID From

(m)

To

(m)

Mineralised Width

(m)

Grade

(Wt% LREO)

TKDD019

 

 

including

9.25

28.0

42.50

55.25

60.25

67.00

71.25

81.75

17.75

32.50

63.50

56.00

63.25

68.50

72.25

83.50

8.50

4.50

21.00

0.75

3.00

1.50

1.00

1.75

1.72

2.00

2.02

3.69

2.61

1.64

1.82

2.58

TKDD020

Including

 

 

 

including

2.25

4.00

10.0

14.5

19.25

19.50

22.75

28.25

16.75

5.50

13.0

16.0

31.5

21.0

25.0

30.0

14.5

1.50

3.00

1.50

12.25

1.50

2.25

1.75

2.53

3.47

3.00

5.95

2.27

2.82

2.93

2.86

TKDD021

 

 

including

0.50

11.5

22.25

34.25

38.5

46.25

4.50

12.0

41.25

35.75

41.0

48.5

4.00

0.50

19.0

1.50

2.50

2.25

2.00

2.62

2.47

3.46

4.03

2.36

TKDD022 0.00 2.00 2.00 1.87
TKDD023 0.00

8.75

21.25

5.25

16.0

22.75

5.25

7.25

1.50

3.03

3.22

4.53

TKDD024 21.0 26.75 5.75 1.78
TKDD025

including

3.25

5.75

13.0

17.25

25.0

25.75

6.50

15.0

21.75

25.75

22.5

0.75

2.00

4.50

0.75

3.18

3.25

6.86

5.42

5.65

TKDD026 8.00

9.50

19.25

12.25

11.25

2.75

2.02

3.54

TKDD027 8.75 9.75 1.00 0.73
TKDD028 1.00 14.0 14.0 2.17
TKDD029

 

including

2.00

19.0

25.25

7.75

27.5

27.0

5.75

8.50

1.75

1.51

2.84

4.34

TKDD030

including

2.25

9.50

13.5

33.25

51.0

10.5

14.75

34.5

48.75

1.00

1.25

1.25

2.20

3.16

3.55

3.08

TKRC001 1.00

20.0

13.00

23.0

13.00

3.00

1.54

1.48

TKRC002 10.0 18.0 8.00 1.64
TKRC003 22.0 25.0 3.00 1.95
TKRC004

 

 

including

16.0

27.0

36.0

56.0

22.0

31.0

77.0

60.0

6.00

4.00

41.0

4.00

1.35

1.84

2.25

3.78

TKRC005 7.00 19.0 12.0 2.42
TKRC006 1.00 7.00 6.00 0.60
TKRC007

 

Including

13.0

21.0

23.0

27.0

40.0

51.0

56.0

15.0

67.0

24.0

38.0

47.0

54.0

59.0

2.00

46.0

1.00

11.0

7.00

3.00

3.00

1.86

3.27

4.87

4.42

4.82

3.19

3.07

TKRC008

 

Including

7.00

31.0

54.0

76.0

9.00

79.0

61.0

79.0

2.00

48.0

7.00

3.00

1.04

3.36

5.38

3.90

TKRC009

 

Including

 

Including

 

including

8.00

30.0

32.0

51.0

51.0

66.0

70.0

10.0

45.0

38.0

57.0

53.0

92.0

90.0

2.00

15.0

6.00

6.00

2.00

26.0

20.0

2.47

4.30

6.98

2.80

5.35

4.28

5.08

TKRC010 1.00

54.0

66.0

74.0

89.0

5.00

58.0

71.0

86.0

91.0

4.00

4.00

5.00

12.0

2.00

1.74

2.18

2.10

1.96

2.17

TKRC011

including

3.00

9.00

23.0

28.0

36.00

12.00

26.0

36.0

33.0

3.00

3.00

8.00

2.85

3.39

3.28

3.23

TKRC012

Including

 

including

3.00

4.00

25.0

27.0

21.0

10.0

39.0

34.0

18.0

6.00

14.0

7.00

3.00

3.61

3.07

3.60

TKRC013

including

3.00

34.0

46.0

39.0

43.0

5.00

2.55

3.25

TKRC014

including

10.0

14.0

21.0

31.0

35.0

50.0

18.0

28.0

33.0

46.0

40.0

4.00

7.00

2.00

11.0

3.37

3.53

4.87

4.51

3.75

TKRC015

including

26.0

30.0

44.0

51.0

47.0

35.0

47.0

61.0

21.0

5.00

3.00

10.0

1.69

3.11

2.03

2.53

TKRC016

 

 

 

including

14.0

30.0

53.0

70.0

71.0

22.0

40.0

66.0

85.0

78.0

8.00

10.0

13.0

15.0

7.00

2.40

4.00

3.10

4.30

5.90

TKRC017

Including

 

 

 

 

 

including

4.00

8.00

24.0

56.0

63.0

76.0

84.0

95.0

20.0

14.0

31.0

58.0

64.0

80.0

112.0

106.0

16.0

6.00

7.00

2.00

1.00

4.00

28.0

11.0

1.72

2.65

1.17

1.62

2.35

2.25

2.87

4.81

TKRC018

 

 

 

including

5.00

13.0

40.0

50.0

51.0

6.00

14.0

46.0

81.0

59.0

1.00

1.00

6.00

31.0

8.00

1.91

2.01

3.27

3.43

5.84

TKRC019

 

 

 

 

including

20.0

30.0

46.0

50.0

55.0

66.0

83.0

27.0

39.0

47.0

52.0

87.0

72.0

86.0

7.00

9.00

1.00

2.00

32.0

6.00

3.00

2.07

3.47

2.13

1.68

2.84

3.34

3.48

TKRC020

including

14.0

20.0

25.0

56.0

92.0

17.0

98.0

28.0

79.0

96.0

3.00

78.0

3.00

23.0

4.00

1.38

2.81

4.97

4.85

4.26

 

Qualified Person

The technical information contained in this announcement has been reviewed, verified, and approved by Colin Bird, C. Eng, FIMMM, South African and UK Certified Mine Manager and Director of Kendrick Resources plc, with more than 40 years’ experience mainly in hard rock mining.

ENDS

For additional information please contact:

Kendrick Resources Plc:

Chairman

 

Tel: +44 2039 616 086

Colin Bird

AlbR Capital Limited

Financial Adviser

Joint Broker

Tel: +44 (0)207 7469 0930

David Coffman / Dan Harris

 Jon Bellis

Shard Capital Partners LLP

Joint Broker

Tel: +44 207 186 9952

Damon Heath / Isabella Pierre

 

 

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS STIPULATED UNDER THE UK VERSION OF THE MARKET ABUSE REGULATION NO. 596/2014 WHICH IS PART OF ENGLISH LAW BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018, AS AMENDED.  UPON PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE, THIS INFORMATION IS CONSIDERED TO BE IN THE PUBLIC DOMAIN. 

About Kendrick Resources Plc

Kendrick Resources Plc is a mineral exploration and development company whose strategy is to acquire and enhance the value of its mineral resource projects through exploration, technical studies and resource development and to bring projects to production through joint venture or other arrangements or their sale.

The Kendrick Board has extensive resource project experience in southern Africa and has gravitated back to the region with the acquisition of the Bonya Rare Earth Project located in Namibia and in late 2025 exercised an option in relation to the acquisition of the Blue Fox Licence, 34412-HQ-LEL located in northwest Zambia.

About Teufelskuppe:

Development Plan Progress

The Company is progressing the TK project in line with the published Development Plan schedule announced on 6 May 2026. Verification of the in-house MRE and upgrading to compliance with JORC (2012) has been initiated alongside the still progressing diamond drilling and reverse circulation drilling campaign to ascertain the depth and sub-surface spread of carbonatite mineralisation below the natural surface profile of the TK landscape.

Glossary:

Carbonatite: An igneous rock containing >50 modal % primary (magmatic) carbonate and ≤20 wt% SiO2. There are three main types: Calcitic (calcio) carbonatites, magnesiocarbonatites and ferrocarbonatites. Occur as lava flows and more commonly as intrusions.

Carbonate: Common minerals containing the carbonate anion (CO32-) for example calcite (CaCO3), dolomite (CaMg(CO3)2, siderite (FeCO3) and Ankerite Ca(Fe,Mg,Mn)(CO3)2.

Cone sheet: A type of ring intrusion with margins which dip inwards

Ferrocarbonatite: A carbonatite in which the main carbonate mineral is iron-rich, for example, ferroan dolomite, ankerite or siderite.

Fluorcarbonates: A group of minerals consisting of variable calcium, high fluorine, and rare earth elements. Examples are Synchysite and Parisite.

MRE: Mineral Resource Estimate

Parisite: A group of fluorcarbonates with typical mineral formula Ca(Ce/La/Nd/REE)2(CO3)3F2.

pXRF: X-ray fluorescence

JORC 2012 Mineral Resource Code: The Australian Code for Reporting Exploration results, Mineral resources and Ore reserves. Enforces minimum standards and guidelines for public reporting of mineral resources and ore reserves. Classifies mineral resources into Inferred, Indicated and Measured based on the level of geological confidence regarding the quality and quantity of the resource.

Petrological studies: the study of the formation of rocks, subsequent deformation and alteration. Quantification of mineral composition and mineral relationships.

REE: Rare Earth Elements. Elements with an atomic number between 57 and 71 plus Scandium and Yttrium.

TREE: Total Rare Earth Elements; sum of LREE and HREE to a total of 17 elements.

LREE: Light Rare Earth Elements including Lanthanum (La), Cerium (Ce), Neodymium (Nd), Praseodymium (Pr), Scandium (Sc), Samarium (Sm) and Europium (Eu) and Promethium (Pm).

HREE: Heavy Rare Earth Elements including Yttrium (Y), Gadolinium (Gd), Terbium (Tb), Dysprosium (Dy), Holmium (Ho), Erbium (Er), Thulium (Tm), Ytterbium (Yb) and Lutetium (Lu).

LREO: Light Rare Earth Oxides including La2O3, CeO2, Nd2O3, Pr6O11, Sc2O3, Sm2O3, Eu2O3.

HREO: Heavy Rare Earth Oxides including Y2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3 and Lu2O3.

TREO: Total Rare Earth Oxides.

Wt % = Weight Percentage

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 

END